XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)
SKU
XD475-HVCD
List price
$164.95
Price
$164.95

    The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.

    By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.

    Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.

    Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.

    Features:

    • Stock HP and Flow Rating
    • Best In Class End-Of-Line Testing Nozzles
    • Tested For Flow, Leakage and Needle Lift
    • In-Line Error Proofing Incorporated In Assembly Process
    CALIFORNIA WARNING: Cancer and Reproductive Harm www.P65Warnings.ca.gov
    Vehicle Fitment
    1999-2003 Ford F-350 Super Duty Lariat
    1999-2003 Ford F-450 Super Duty Lariat
    1999-2003 Ford F-250 Super Duty Lariat
    1999-2003 Ford F-250 Super Duty XL
    1999-2003 Ford F-450 Super Duty XL
    1999-2003 Ford F-350 Super Duty XL
    1999-2003 Ford F-250 Super Duty XLT
    1999-2003 Ford F-450 Super Duty XLT
    1999-2003 Ford F-350 Super Duty XLT
    2003 Ford F-350 Super Duty King Ranch
    Brand
    XDP Xtreme Diesel Performance
    Category
    Air & Fuel
    Fuel
    Fuel Injector
    Specs
    Country of Origin: USA
    Sold As: Each
    Availability: Available
    Universal: No
    About:

    XDP is a leading retailer, distributor, and manufacturer of top-quality OE, OER, and aftermarket diesel parts and accessories. Strategically positioned across the United States, XDP houses one of the largest and most diverse diesel-specific invent

    Fuel Type
    Diesel
    Vehicle Type
    Truck/SUV
    Core Charge
    $125.00